Production Processing Standards
- Area:
- Production Processing
- Topic:
- Job Scheduling
- Standard:
- Unless otherwise specified in documentation, all jobs placed in
production schedules should be checked for condition codes of 8 or
higher.
Procedures:
- FRS--No change; already checking for 8 or higher
- BR--Lower to checking for 8 or higher. Now checking for 12 or higher.
- LMS--Check for 8 or higher
- Financial Aid--Check for 8 or higher
- HRS--Check for 8 or higher
- Student Information--Check for 8 or higher
- Other--Check for 8 or higher
Notes:
Standards
Last Modified: Friday, 27-Feb-2004 09:30:56 CST
©2004 All Rights Reserved