Electrical Distribution

Keith Nall Supervisor (334) 844-9588

Electrical Distribution operates and maintains the 115 kV and 44 kV Electrical Distribution Substations and the distribution system for the University. The 44 kV substation is located on Duncan Drive behind Plainsman Park . The 115 kV substation is located on Hemlock Drive . Over 90% of the distribution system is located underground.

Additional duties performed by this department include:

  • Maintain traffic signalization
  • Maintain all campus lighting above 12 feet
  • Electrical meter reading