Auburn University
Auburn University
[an error occurred while processing this directive]
Auburn University
 


Table of Contents

A10 – Foundations
1. General
2. Concrete
3. Testing and Laboratory Analysis


A20 – Basement Construction
1. General
2. Waterproofing


B10 – Superstructure
1. General
2. Concrete
3. Structural Steel


B20 – Exterior Closure
1. Exterior Walls
2. Exterior Windows
3. Exterior Doors


B30 – Roofing
1. General
2. Low Slope Roofs
3. Pitched Roofs
4. Roof openings
5. Roof Mounted Equipment

C10 – Interior Construction
1. Partitions
2. Interior Doors
3. Specialties
4. Signage
5. Room Numbering
6. Custodian Closets


C20 – Staircases


C30 – Interior Finishes
1. General
2. Walls
3. Flooring
4. Ceilings


D10 – Conveying Systems


D20 – Plumbing
1. Piping
2. Plumbing Fixtures
3. Plumbing Pumps

D30 – HVAC
1. General
2. Basic HVAC Materials and Methods
3. Heating, Ventilating, and Air Conditioning Equipment
4. Air Distribution

D40 – Fire Protection
1. General
2. Inspections and Approvals
3. Fire Alarm
4. Fire Suppression
5. Fire Extinguishers


D50 – Electrical
1. General
2. General Telecommunications
3. Telecommunication Rooms
4. Telecommunication Pathways
5. Telecommunication Outlets


E10 – Equipment
1. General
2. Serviceability and Accessibility
3. Vending Equipment


E20 – Furnishings
1. General
2. Desk Groups


F10 – Special Construction
1. Lightning Protection
2. Card Access


F20 – Selective Building Demolition
1. Hazardous Material Abatement

G10 – Site Preparation
1. Site Surveying
2. Subsurface Exploration
3. Site Clearing
4. Excavation
5. Backfill
6. Tree and Plant Protection
7. Grading
8. Demolition
9. Site Remediation

G20 – Site Improvements
1. Paving
2. Walks
3. Site Furnishings
4. Dumpsters
5. Landscaping

G30 – Site Civil / Mechanical Utilities
1. General
2. Material
3. Piped Energy Distribution
4. Sanitary Sewer
5. Site Drainage


G40 – Site Electrical Utilities
1. Lighting Poles
2. Electrical Transformers
3. Underground Ducts
4. Telecommunications

Appendix A - Auburn University Contact List
Appendix B - Variance Request Form
Appendix C - Guidelines Revisions Form
Appendix D - Commissioning Guide
Appendix E - Energy Estimate Form
Appendix F - Chilled Water Interface
Appendix G - Hot Water Interface
Appendix H - Piping Identification Guide
Appendix I - Site Survey Checklist
Appendix J - Exterior Envelope Details
Appendix K - ASTM Uniformat II to CSI Masterformat Conversion
Appendix L - CSI Masterformat to ASTM Uniformat II Converstion Chart

previous
 
[an error occurred while processing this directive]