Table of Contents
A10 – Foundations
1.
General
2.
Concrete
3.
Testing and Laboratory Analysis
A20 – Basement Construction
1.
General
2.
Waterproofing
B10 – Superstructure
1.
General
2.
Concrete
3.
Structural Steel
B20 – Exterior Closure
1.
Exterior Walls
2.
Exterior Windows
3.
Exterior Doors
B30 – Roofing
1.
General
2.
Low Slope Roofs
3.
Pitched Roofs
4.
Roof openings
5.
Roof Mounted Equipment
C10 – Interior Construction
1.
Partitions
2.
Interior Doors
3.
Specialties
4.
Signage
5.
Room Numbering
6.
Custodian Closets
C20 – Staircases
C30 – Interior Finishes
1.
General
2.
Walls
3.
Flooring
4.
Ceilings
D10 – Conveying Systems
D20 – Plumbing
1.
Piping
2.
Plumbing Fixtures
3.
Plumbing Pumps
D30 – HVAC
1. General
2. Basic HVAC Materials and Methods
3. Heating, Ventilating, and Air Conditioning Equipment
4.
Air Distribution
D40 – Fire Protection
1.
General
2.
Inspections and Approvals
3.
Fire Alarm
4.
Fire Suppression
5.
Fire Extinguishers
D50 – Electrical
1.
General
2.
General Telecommunications
3.
Telecommunication Rooms
4.
Telecommunication Pathways
5.
Telecommunication Outlets
E10 – Equipment
1.
General
2.
Serviceability and Accessibility
3.
Vending Equipment
E20 – Furnishings
1.
General
2.
Desk Groups
F10 – Special Construction
1.
Lightning Protection
2.
Card Access
F20 – Selective Building Demolition
1. Hazardous Material Abatement
G10 – Site Preparation
1.
Site Surveying
2.
Subsurface Exploration
3.
Site Clearing
4.
Excavation
5.
Backfill
6.
Tree and Plant Protection
7.
Grading
8.
Demolition
9.
Site Remediation
G20 – Site Improvements
1. Paving
2. Walks
3. Site Furnishings
4. Dumpsters
5. Landscaping
G30 – Site Civil / Mechanical Utilities
1.
General
2.
Material
3.
Piped Energy Distribution
4.
Sanitary Sewer
5.
Site Drainage
G40 – Site Electrical Utilities
1.
Lighting Poles
2.
Electrical Transformers
3.
Underground Ducts
4.
Telecommunications
Appendix A - Auburn University Contact List
Appendix B - Variance Request Form
Appendix C - Guidelines Revisions Form
Appendix D - Commissioning Guide
Appendix E - Energy Estimate Form
Appendix F - Chilled Water Interface
Appendix G - Hot Water Interface
Appendix H - Piping Identification Guide
Appendix I - Site Survey Checklist
Appendix J - Exterior Envelope Details
Appendix K - ASTM Uniformat II to CSI Masterformat Conversion
Appendix L - CSI Masterformat to ASTM Uniformat II Converstion Chart
|